Or, I should say “nearly” completed as they still need the guiderail boards added along the bottom sides (attached to the tops of the floor risers and holding the bottom row of bundles in place laterally in the real load). But I’m currently out of 2×6 strip.
Weyerhaeuser:
Normick-Perron:
Lecours Lumber: