Last run of the ‘Algoma Spirit’ Passenger Train

This may seem like a late post, but I was on vacation up north last week and just returned home yesterday.

Today marks exactly one week since the last RailMark operated passenger train departed northbound from Hawk Junction. About a week before, CN had terminated their relationship with RailMark effective July 15, and accordingly, on Monday July 13 the last northbound run departed Hawk Junction, with the equipment later moved to Sault Ste. Marie on July 14.

I already had vacation booked and had been planning a railfan tour of the former ACR and the Ontario Northland when this news broke. As it turned out, the day I had already planned to be in Wawa ended up being the day of the last northbound departure out of Hawk Junction, so I was able to catch the last departure. I didn’t end up scheduling in a ride, but I was at least able to photograph and see it off.
IMG_3206

As an earlier post on this blog noted, for the last few weeks of service, the train was operating north of Hawk Junction only, with no service provided south of Hawk Junction, and occasionally erratic north of there.

The last run north on July 13 accordingly originated out of Hawk Junction yard where it had parked the night before. The engine uncoupled and ran around in order to be on the head end facing north and moved the train from its overnight storage location in one of the yard tracks over to the station platform to load passengers (3 or 4 people riding on a one-way ticket to Errington’s Wilderness Island Resort at Wabatong – planning to fly out later via float plane as there would be no more train service).

IMG_3216

The last run would depart Hawk Junction, run as far as Oba only, runaround and return to Hawk that evening. The next day, the equipment was scheduled to head to Sault Ste. Marie, officially ending service.

IMG_3220

In the wake of the service’s termination, everything just continues to give the impression of a huge mess. The EDC and passenger working group have indicating that they are trying to investigate other options to get the service running again. As RailMark was CN’s choice (from which the working group has tried to distance themselves), the city and working group publicly suggested that CN should step in to “clean up its mess” and operate the passenger service in the interim. CN for its part, has said they are not in a position to do so. Meanwhile, RailMark suggested a willingness to keep things going on a month-to-month agreement, even if another operator is ultimately chosen. The EDC rejected this proposal as unrealistic.

The impacts of the lost service and the finger-pointing and recriminations continue. Many blame RailMark of course, for not being able to prove they can run a proper service. Some blame CN for their choice of RailMark and question the due diligence , Some of the more conspiratorily-minded suggest it was CN’s plan all along to get rid of the passenger service without being the villain. For their part, just today RailMark fired back with a scathing missive against the city and the EDC, while admitting some mistakes on both sides, placing most of the blame squarely on bureaucratic rigidity and lambasting a “lack of leadership”, indicating that the line of credit which was a pre-condition of the agreement was difficult to obtain without the signed agreement, and suggesting that RailMark has become a convenient political scapegoat.

Here’s a few links to recent articles in the local media covering the ongoing situation:

Freight Car Friday #43 – Thiele Kaolin Tank Cars

SAMSUNG DIGIMAX 360

Photographed in the former ACR Steelton Yard in August 2004, ACFX 79202 is a good example of a clay slurry service tank car leased to Thiele Kaolin of Sandersville, Georgia.

Kaolinite is a natural occurring mineral often found in a clay form called kaolin. Shipped in either a dry powdered form or mixed with water to form a slurry, one of the primary uses of kaolin is coatings for glossy papers like those found in your favourite magazine. Before it closed down, the St. Marys Paper mill in Sault Ste. Marie produced such high quality papers for the American market, and tank cars of clay slurry would have been common around Sault Ste. Marie.

One interesting thing about the photo above is that all three leased cars visible here are built from different designs and builders. UTLX 300950 to the right was built by and leased from Union Tank Car; ACFX 79202 is built by and leased from ACF Industries while the unknown car to the left was built by Trinity Industries and possibly leased from either GATX, GE Railcar Services (NATX) or Trinity Leasing (TILX).

Freight Car Friday #42 – GLMX 1023

IMG_7721

This gondola, seen on October 1, 2013 being switched out in the Ontario Northland yard at Hearst, bears markings indicating its ownership by Legault Metal of Val D’Or, Quebec.

Legault is a local scrap and metal products dealer serving the area around Val D’Or and Rouyn-Noranda, Quebec. They apparently own their own small fleet of about 30 assorted secondhand gondolas for steel scrap. On my northern Ontario trips in 2013, I saw several of these in various places on both the Ontario Northland and former Algoma Central railways. These appear to route over the ONR from Noranda to Englehart, then via Cochrane and Hearst to interchange to CN and travel down the former Algoma Central, likely delivering local scrap metal to Essar Steel in Sault Ste. Marie for recycling.

For more information on Legault Metal, see their website.

Passenger Service to Hearst ending on July 15

Well, that’s it. Thanks to the lack of financing obtained by RailMark, it seems the passenger service will make its last run next week:

Sault-Hearst rail service to cease July 15

RailMark’s financing, in the form of a line of credit, was the Economic Development Corporation’s primary pre-condition for RailMark to prove their financial health and stability prior to having the city sign the agreement to transfer funding from the federal government and while at last report RailMark was still attempting to obtain sources of financing, it appears this is no longer forthcoming.

Passenger Service Still Limited on the ACR

It appears the difficulties with the Sault Ste. Marie to Hearst passenger service on the former ACR continue, at least south of Hawk Junction.

According to an article in the Sault Star, since June 25 the service has only been operating between Hawk Junction and Hearst, with travellers from Sault Ste. Marie being shuttled up the road from Sault Ste. Marie to Wawa, but otherwise providing no service to points south of Hawk Junction.

Since RailMark has fully taken over operation of the passenger service, they only have a single crew available for running the train, and with several slow orders on the line, it can take over the 12 hours allowed for a crew to be on duty to make the entire trip from Sault Ste. Marie to Hearst or vice versa. CN would make the run using two crews, but RailMark only has one crew. This is the same reason that caused the earlier service disruption that stranded people: when allegations of a violation were brought against the train crew (which they were later cleared), they could not legally operate a train while under investigation and RailMark had no other crews.

My question that comes to mind: with this crew situation, what happens if an employee gets sick or ever wants to have their own vacation? ‘Sorry, your train didn’t run today because the engineer got a cold’? I understand that at this point, the funding is a sticking point with RailMark being able to provide more crews, but now we have only half an operation running, and certain camp and lodge operators are starting to become quite vocal about their disappointment and continuing to express concern about the overall uncertainty of the whole operation, which this is not continuing to mitigate.

This leaves a whole section of the line unserved, and while there aren’t really communities along the line, the heaviest concentration of private camps and cabins on the ACR is in the first hundred miles north of Sault Ste. Marie, and there is currently absolutely no access to them and this still puts a damper on the ‘Tour of the Line’ experience and also cancels the Canyon Combo that CN used to operate, wherein you could ride the Agawa Canyon Tour Train to Canyon, experience the park and then be picked up by the regular train to continue your journey. (And we’re just finishing up the Canada Day-Independence Day combo long weekend, a typically heavy tourist weekend.)

So the struggle continues; and I guess I should only expect to catch the Agawa Canyon Tour Train through the Sault Ste. Marie-Searchmont area when I’m up there on vacation soon and not try to wait for and catch the regular train, which won’t be coming.